MSAS 107 over US 169

1.6 MI S OF JCT TH494;169 · County 053, Minnesota · Built 2004 · 6 Lanes · 7,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
27295
Year Built
2004
Length
66.3 m (217.5 ft)
Max Span
33.3 m
Width
37.6 m (123.4 ft)
Lanes
6
Daily Traffic
7,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.