MN 100 over TH 55

AT THE JCT TH 55; 100 · County 053, Minnesota · Built 2000 · 6 Lanes · 84,656 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
27121
Year Built
2000
Length
68.3 m (224.1 ft)
Max Span
66.8 m
Width
36.3 m (119.1 ft)
Lanes
6
Daily Traffic
84,656
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.