CON 5772 over I 494; TH 77 NB ON RAMP
AT THE JCT TH 77; 494 · County 053, Minnesota · Built 1989 · 2 Lanes · 17,404 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.860006, -93.246642
This bridge is in worse condition than 45.5% of bridges in County 053. The average bridge in Minnesota is 0 years old; this one is 37 years old.
Nearby Bridges
CON 4313 over 79TH ST; TH 77 ON RAMP
Built 1989
CON 5617 over AMERICAN BLVD
Built 1988
CON 398 over AMERICAN BLVD
Built 1988
CON 2478 over AM BLVD; 494/5 RAMPS
Built 1989
CON 1689 over AMERICAN BLVD
Built 1989
MN 77 over AMERICAN BLVD
Built 1988
CON 2758 over AMERICAN BLVD
Built 1988
MN 77 over I 494
Built 1958
CON 2478 over I 494; TH 77 NB ON RAMP
Built 1989
MN 77 over NB off ramp to WB 494
Built 1988
Bridge Details
- Structure #
- 27052B
- Year Built
- 1989
- Length
- 177.9 m (583.7 ft)
- Max Span
- 45.1 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 17,404
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.