MSAS 127 over TH 100; OFF RAMP

0.8 MI SW OF JCT TH 694 · County 053, Minnesota · Built 1970 · 2 Lanes · 3,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
27042
Year Built
1970
Length
95.1 m (312 ft)
Max Span
24.1 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
3,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$468,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.