CSAH 152 over TH 100

1.8 MI SW OF JCT TH 694 · County 053, Minnesota · Built 1963 · 6 Lanes · 19,718 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
27038
Year Built
1963
Reconstructed
2014
Length
60.4 m (198.2 ft)
Max Span
29.4 m
Width
27 m (88.6 ft)
Lanes
6
Daily Traffic
19,718
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.