US 52 over BUTLER CREEK

4.0 MI S OF JCT TH 19 · County 049, Minnesota · Built 2023 · 5 Lanes · 21,379 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
25X08
Year Built
2023
Length
9.2 m (30.2 ft)
Max Span
4.3 m
Lanes
5
Daily Traffic
21,379
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.