T 150 over ROBINSON CREEK
0.5 MI S OF CO LINE · County 099, Minnesota · Built 1917 · 1 Lanes · 4 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
43.830142, -92.594111
This bridge is in worse condition than 93% of bridges in County 099. The average bridge in Minnesota is 0 years old; this one is 109 years old.
Nearby Bridges
T 176 over ROBINSON CREEK
Built 2000
CSAH 6 over ROBINSON CREEK
Built 2003
T 178 over STREAM
Built 2015
CR 115 over N BR ROOT RIVER
Built 1988
CSAH 15 over I 90
Built 1961
CSAH 15 over ROBINSON CREEK
Built 1998
T 118 over STREAM
Built 1992
T 13 over ROBINSON CREEK
Built 2000
CSAH 6 over I 90
Built 1961
CSAH 3 over N BR ROOT RIVER
Built 1996
Bridge Details
- Structure #
- 2496
- Year Built
- 1917
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.2 m
- Width
- 5.7 m (18.7 ft)
- Lanes
- 1
- Daily Traffic
- 4
- Material
- Concrete
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $585,000,000
- Total Project Cost
- $630,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.