MN 65 over MISS RVR; MAIN; W RVR PK

0.3 MI NE OF JCT TH 952A · County 053, Minnesota · Built 1917 · 4 Lanes · 14,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
2440
Year Built
1917
Reconstructed
2023
Length
575.3 m (1887.5 ft)
Max Span
72.1 m
Width
24.9 m (81.7 ft)
Lanes
4
Daily Traffic
14,500
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.