T 22 over BADGER CREEK

1.5 MI W OF JCT CSAH 9 · County 043, Minnesota · Built 2022 · 2 Lanes · 56 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
22J59
Year Built
2022
Length
6.6 m (21.7 ft)
Max Span
3 m
Lanes
2
Daily Traffic
56
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.