MN 23 over STREAM

1.9 MI NE OF JASPER · County 117, Minnesota · Built 1936 · 2 Lanes · 3,278 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
2154
Year Built
1936
Length
8.1 m (26.6 ft)
Max Span
3.8 m
Lanes
2
Daily Traffic
3,278
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$102,000,000
Total Project Cost
$213,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.