T 147 over STREAM

0.3 MI N OF JCT CSAH 10 · County 039, Minnesota · Built 1999 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

44.013089, -92.8993

This bridge is in worse condition than 60.8% of bridges in County 039. The average bridge in Minnesota is 0 years old; this one is 27 years old.

Nearby Bridges

Bridge Details

Structure #
20553
Year Built
1999
Length
16 m (52.5 ft)
Max Span
15.5 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
25
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$300,000,000
Total Project Cost
$400,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.