CSAH 53 over CENTER CREEK
0.6 MI S OF GRANADA · County 091, Minnesota · Built 1930 · 2 Lanes · 1,089 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.690208, -94.347989
This bridge is in worse condition than 75.9% of bridges in County 091. The average bridge in Minnesota is 0 years old; this one is 96 years old.
Nearby Bridges
T 48 over CENTER CREEK
Built 1977
T 165 over SOUTH CREEK
Built 1918
CSAH 53 over I 90
Built 1972
T 295 over CENTER CREEK
Built 1976
CSAH 26 over SOUTH CREEK
Built 2000
T 107 over SOUTH CREEK
Built 1952
T 40 over CENTER CREEK
Built 1918
T 40 over I 90
Built 1972
CR 159 over CENTER CREEK
Built 1965
CSAH 59 over I 90
Built 1973
Bridge Details
- Structure #
- 1925
- Year Built
- 1930
- Length
- 19.2 m (63 ft)
- Max Span
- 14 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,089
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $347,000,000
- Total Project Cost
- $217,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.