CSAH 53 over CENTER CREEK

0.6 MI S OF GRANADA · County 091, Minnesota · Built 1930 · 2 Lanes · 1,089 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 5 Fair
Substructure 5 Fair

Location

43.690208, -94.347989

This bridge is in worse condition than 75.9% of bridges in County 091. The average bridge in Minnesota is 0 years old; this one is 96 years old.

Nearby Bridges

Bridge Details

Structure #
1925
Year Built
1930
Length
19.2 m (63 ft)
Max Span
14 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
1,089
Material
Concrete
Design
Arch - Deck
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$347,000,000
Total Project Cost
$217,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.