MN 61 over HOLLOW ROCK CREEK
2.6 MI SW MINERAL CTR RD · County 031, Minnesota · Built 2021 · 2 Lanes · 1,198 vehicles/day
Overall
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
47.917375, -89.743464
This bridge is in worse condition than 44.1% of bridges in County 031. The average bridge in Minnesota is 0 years old; this one is 5 years old.
Bridge Details
- Structure #
- 16011
- Year Built
- 2021
- Length
- 25.1 m (82.3 ft)
- Max Span
- 24.2 m
- Width
- 14.5 m (47.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,198
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.