MN 61 over KADUNCE RIVER

9.5 MI NE OF GUNFLINT TR · County 031, Minnesota · Built 2005 · 2 Lanes · 2,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
16004
Year Built
2005
Length
16.1 m (52.8 ft)
Max Span
15.4 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
2,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$416,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.