T 310 over DITCH #17

0.5 MI N OF JCT T 243 · County 027, Minnesota · Built 2023 · 2 Lanes · 12 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
14K68
Year Built
2023
Length
7.9 m (25.9 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
12
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.