T 157 over JD #7 (HAWK CREEK)

0.5 MI E OF JCT CSAH 2 · County 023, Minnesota · Built 2019 · 2 Lanes · 49 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
12J56
Year Built
2019
Length
14.4 m (47.2 ft)
Max Span
4.4 m
Lanes
2
Daily Traffic
49
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.