CSAH 23 over S FK CROW RIVER
0.5 MI N OF JCT CSAH 30 · County 019, Minnesota · Built 1973 · 2 Lanes · 657 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
44.893064, -93.889739
This bridge is in worse condition than 92.2% of bridges in County 019. The average bridge in Minnesota is 0 years old; this one is 53 years old.
Nearby Bridges
MN 7 over S FK CROW RIVER
Built 1974
MN 7 over STREAM
Built 1940
CSAH 30 over S FK CROW RIVER
Built 1980
CR 123 over STREAM
Built 1980
CSAH 32 over S FK CROW RIVER
Built 2022
MN 25 over S FK CROW RIVER
Built 1998
CSAH 10 over DAKOTA RAIL TRAIL
Built 2011
MN 7 over STREAM
Built 1940
T 26 over JOINT DITCH # 1
Built 2020
CSAH 33 over JOINT DITCH # 1
Built 1990
Bridge Details
- Structure #
- 10507
- Year Built
- 1973
- Length
- 65 m (213.3 ft)
- Max Span
- 24.4 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 657
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.