US 212 over CREEK RD; CHASKA CREEK

0.37 MI S JCTCSAH10;US212 · County 019, Minnesota · Built 2008 · 2 Lanes · 9,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
10027
Year Built
2008
Length
96.4 m (316.3 ft)
Max Span
46 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
9,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.