MN 210 over OTTER CREEK

0.2 MI W OF JCT TH 35 SB · County 017, Minnesota · Built 2023 · 5 Lanes · 7,600 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
09X06
Year Built
2023
Length
8.3 m (27.2 ft)
Max Span
3.7 m
Lanes
5
Daily Traffic
7,600
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.