T 78 over MAPLE RIVER
0.3 MI E OF JCT CSAH 1 · County 013, Minnesota · Built 2005 · 2 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
43.978542, -94.073328
This bridge is in worse condition than 39.9% of bridges in County 013. The average bridge in Minnesota is 0 years old; this one is 21 years old.
Nearby Bridges
CSAH 10 over MAPLE RIVER
Built 1973
CSAH 13 over BLUE EARTH RIVER
Built 2024
CSAH 18 over MAPLE RIVER
Built 1963
T 96 over MAPLE RIVER
Built 2009
CSAH 10 over STREAM
Built 2006
CSAH 10 over BLUE EARTH RIVER
Built 1956
CR 132 over Co Ditch # 78
Built 2000
T 31 over PROVIDENCE CRK (JD #49)
Built 1979
US 169 over BLUE EARTH RIVER
Built 1979
CSAH 1 over PROVIDENCE CRK (JD #49)
Built 2015
Bridge Details
- Structure #
- 07582
- Year Built
- 2005
- Length
- 40.4 m (132.5 ft)
- Max Span
- 15.2 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $506,000,000
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.