T 78 over MAPLE RIVER

0.3 MI E OF JCT CSAH 1 · County 013, Minnesota · Built 2005 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
07582
Year Built
2005
Length
40.4 m (132.5 ft)
Max Span
15.2 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
50
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$506,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.