CR 152 over MAPLE RIVER

0.6 MI S OF JCT TH 30 · County 013, Minnesota · Built 2010 · 2 Lanes · 120 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
07557
Year Built
2010
Length
26.4 m (86.6 ft)
Max Span
25.5 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
120
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$382,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.