US 14 over UP RR
1.4 MI E OF JCT TH 169 · County 013, Minnesota · Built 1977 · 3 Lanes · 15,742 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.189633, -93.987514
This bridge is in worse condition than 60.6% of bridges in County 013. The average bridge in Minnesota is 0 years old; this one is 49 years old.
Nearby Bridges
US 14 over UP RR
Built 1977
US 14 over N RIVERFRONT DR
Built 1977
US 14 over N RIVERFRONT DR
Built 1977
US 14 over CSAH 5
Built 1976
US 14 over CSAH 5
Built 1976
US 14 over MINN RIVER; TRAIL
Built 1976
CSAH 57 over STREAM; TRAIL
Built 1978
US 14 over CSAH 3
Built 1976
US 14 over CSAH 3
Built 1976
CSAH 82 over THOMPSON RAVINE
Built 2003
Bridge Details
- Structure #
- 07016
- Year Built
- 1977
- Length
- 52.2 m (171.3 ft)
- Max Span
- 20.6 m
- Width
- 17.2 m (56.4 ft)
- Lanes
- 3
- Daily Traffic
- 15,742
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $681,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.