MN 60 over CSAH 6
IN LAKE CRYSTAL · County 013, Minnesota · Built 1967 · 4 Lanes · 10,148 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
44.106789, -94.226158
This bridge is in worse condition than 74.6% of bridges in County 013. The average bridge in Minnesota is 0 years old; this one is 59 years old.
Nearby Bridges
M 31 over CD# 56
Built 2008
M 29 over CD# 56
Built 2008
CSAH 9 over CO DITCH # 56
Built 1990
M 25 over CD # 56
Built 2010
T 899 over MINNEOPA CREEK
Built 1975
CSAH 20 over Minneopa Creek
Built 2002
MN 60 over CHAN BTWN LAKES
Built 1968
CR 112 over MINNEOPA CREEK
Built 1940
MN 60 over MINNEOPA CREEK
Built 1967
CR 111 over MINNEOPA CREEK
Built 2019
Bridge Details
- Structure #
- 07003
- Year Built
- 1967
- Length
- 63.1 m (207 ft)
- Max Span
- 24.3 m
- Width
- 24.3 m (79.7 ft)
- Lanes
- 4
- Daily Traffic
- 10,148
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.