MN 95 over ST. FRANCIS RIVER

9.7 MI E OF JCT TH 23 · County 009, Minnesota · Built 2000 · 2 Lanes · 5,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
05014
Year Built
2000
Length
27.4 m (89.9 ft)
Max Span
10 m
Width
15.3 m (50.2 ft)
Lanes
2
Daily Traffic
5,300
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.