MN 65 over SANDY RIVER

12.8 MI N OF W JCT TH 21 · County 001, Minnesota · Built 2005 · 2 Lanes · 1,269 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

46.78665, -93.324783

This bridge is in worse condition than 70.8% of bridges in County 001. The average bridge in Minnesota is 0 years old; this one is 21 years old.

Nearby Bridges

Bridge Details

Structure #
01013
Year Built
2005
Length
47 m (154.2 ft)
Max Span
23 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
1,269
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$801,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.