PIERCE STOCKING DR over GREENAN ROAD
2.5 MILES FROM PARK ENTRA · County 089, Michigan · Built 1960 · 2 Lanes · 400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.861222, -86.043972
This bridge is in worse condition than 12.5% of bridges in County 089. The average bridge in Michigan is 0 years old; this one is 66 years old.
Bridge Details
- Structure #
- 6620001P0000000
- Year Built
- 1960
- Reconstructed
- 1986
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.8 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 400
- Material
- Concrete
- Design
- Tee Beam
- Owner
- National Park Service
- Last Inspected
- N/A
- Est. Improvement
- $40,000
- Total Project Cost
- $60,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.