FOREST ROAD 3470 over SOUTH BRANCH PAINT RIVER
3.3 MI N OF BEECHWOOD · County 071, Michigan · Built 1952 · 1 Lanes · 50 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
46.208131, -88.760339
This bridge is in worse condition than 31.5% of bridges in County 071. The average bridge in Michigan is 0 years old; this one is 74 years old.
Nearby Bridges
NO DATA ENTERED over NO DATA ENTERED
Built 2024
CO RD 657 FH57 over SO BR PAINT RIVER
Built 1987
FAS 927 over PAINT RIVER
Built 1962
FR 153 BASSWOOD over COOKS RUN RIVER
Built 1922
FOREST ROAD 3350 over BUSH CREEK
Built 1955
FDR3350 over BUSH CREEK
Built 2021
FOREST ROAD 3270 over SOUTH BRANCH PAINT RIVER
Built 1957
US-2 over S BR IRON RIVER
Built 1934
OLD BEECHWOOD RD over SO BRANCH IRON RIVER
Built 2003
FH16 FAS 300 over COOKS RUN RIVER
Built 1986
Bridge Details
- Structure #
- 090703000001011
- Year Built
- 1952
- Reconstructed
- 1995
- Length
- 15.2 m (49.9 ft)
- Max Span
- 14.9 m
- Width
- 5.1 m (16.7 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.