E SECOND STREET over LITTLE TOBACCO DRAIN

300 FT S OF E 3RD ST · County 035, Michigan · Built 2022 · 2 Lanes · 30 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
000000000014553
Year Built
2022
Length
7.3 m (24 ft)
Max Span
7.3 m
Lanes
2
Daily Traffic
30
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.