I-75 over LANE DRAIN
I-75 · County 125, Michigan · Built 2020 · 8 Lanes · 103,878 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
42.572919, -83.159211
This bridge is in worse condition than 26.5% of bridges in County 125. The average bridge in Michigan is 0 years old; this one is 6 years old.
Nearby Bridges
WATTLES RD over I-75
Built 2019
I-75 SB over BIG BEAVER RD
Built 2020
I-75 NB over BIG BEAVER RD
Built 2019
I-75 NB over LIVERNOIS RD
Built 2019
I-75 SB over LIVERNOIS RD
Built 2020
I-75 SB over EAST LONG LAKE RD
Built 2020
I-75 NB over EAST LONG LAKE RD
Built 2019
ROCHESTER RD over STURGIS
Built 1975
BIG BEAVER over STURGIS DRAIN
Built 1975
I-75 NB over M-150 (ROCHESTER RD)
Built 2019
Bridge Details
- Structure #
- 000000000014304
- Year Built
- 2020
- Length
- 6.1 m (20 ft)
- Max Span
- 6.1 m
- Lanes
- 8
- Daily Traffic
- 103,878
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.