DEER PATH TRAIL over INDIAN LAKE CANAL
IN SUBDIVISION SEC 34 · County 125, Michigan · Built 1999 · 2 Lanes · 500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.801667, -83.273056
This bridge is in worse condition than 34.3% of bridges in County 125. The average bridge in Michigan is 0 years old; this one is 27 years old.
Nearby Bridges
NAKOMIS over INDIANWOOD LAKE CANAL
Built 1930
DEER PATH TRAIL over PAINT CREEK DRAIN
Built 1999
INDIAN TRAIL over POLLY ANN TRAIL
Built 1999
DRAHNER ROAD over LONG LAKE OUTLET
Built 1960
INDIANWOOD RD over PAINT CREEK
Built 2024
NEWMAN ROAD over PAINT CREEK
Built 1994
MALONEY STREET over CLEAR-LONG LAKE CHANNEL
Built 2022
BELLEVUE AVENUE over LAKE ORION CANAL
Built 1998
SEYMOUR LAKE RD over PAINT CREEK
Built 2006
M-24 over PAINT CREEK
Built 1988
Bridge Details
- Structure #
- 000000000013597
- Year Built
- 1999
- Length
- 36.6 m (120.1 ft)
- Max Span
- 7.6 m
- Width
- 8.8 m (28.9 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Wood or Timber
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.