M-231 over GRAND RIVER

4.5 MI N OF M-45 · County 139, Michigan · Built 2013 · 2 Lanes · 18,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000013460
Year Built
2013
Length
1130.4 m (3708.7 ft)
Max Span
100.6 m
Width
20.1 m (65.9 ft)
Lanes
2
Daily Traffic
18,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.