I-75 SB over HURON RIVER

IN S ROCKWOOD · County 115, Michigan · Built 2009 · 4 Lanes · 31,814 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000013442
Year Built
2009
Length
61 m (200.1 ft)
Max Span
27.4 m
Width
22.3 m (73.2 ft)
Lanes
4
Daily Traffic
31,814
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.