UNIVERSITY DRIVE over I-75

1.6 MI N OF M-59 · County 125, Michigan · Built 2015 · 4 Lanes · 24,399 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000013198
Year Built
2015
Length
69.8 m (229 ft)
Max Span
35.8 m
Width
25.7 m (84.3 ft)
Lanes
4
Daily Traffic
24,399
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.