LAFAYETTE STREET over DEQUINDRE CUT GREENWAY

W OF ST AUBIN · County 163, Michigan · Built 1924 · 6 Lanes · 13,709 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000012381
Year Built
1924
Reconstructed
2009
Length
20.1 m (65.9 ft)
Max Span
10.1 m
Width
34.7 m (113.8 ft)
Lanes
6
Daily Traffic
13,709
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.