SOUTHFIELD ROAD over ECORSE CREEK

LINCOLN PK &ECORSE E/FORT · County 163, Michigan · Built 2024 · 5 Lanes · 19,533 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

42.245019, -83.159517

This bridge is in worse condition than 10.3% of bridges in County 163. The average bridge in Michigan is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
000000000012039
Year Built
2024
Length
28 m (91.9 ft)
Max Span
13.6 m
Width
24.4 m (80.1 ft)
Lanes
5
Daily Traffic
19,533
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.