PENNSYLVANIA ROAD over BLAKELY DRAIN

BWNSTN/TAYLORE/INKSTER · County 163, Michigan · Built 1950 · 2 Lanes · 8,069 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000012019
Year Built
1950
Reconstructed
1972
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
8,069
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.