BRUSH ST over I-75

IN DETROIT · County 163, Michigan · Built 1970 · 3 Lanes · 1,743 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000011782
Year Built
1970
Length
61.9 m (203.1 ft)
Max Span
27.4 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
1,743
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,119,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.