I-75 NB over M-10

IN DETROIT OVER US-10 · County 163, Michigan · Built 1970 · 3 Lanes · 43,891 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000011768
Year Built
1970
Reconstructed
1999
Length
73.1 m (239.8 ft)
Max Span
37.8 m
Width
18.7 m (61.4 ft)
Lanes
3
Daily Traffic
43,891
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.