LIVERNOIS AVE over I-75

IN DETROIT · County 163, Michigan · Built 2021 · 4 Lanes · 1,592 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000011738
Year Built
2021
Length
63.9 m (209.6 ft)
Max Span
33.6 m
Width
32.1 m (105.3 ft)
Lanes
4
Daily Traffic
1,592
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.