I-75 over M-85 (FORT ST)

IN DETROIT · County 163, Michigan · Built 1967 · 9 Lanes · 105,854 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000011733
Year Built
1967
Reconstructed
2002
Length
91.1 m (298.9 ft)
Max Span
32.9 m
Width
46.8 m (153.5 ft)
Lanes
9
Daily Traffic
105,854
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.