I-96 (JEFFRIES) over RAMP TO M-8

IN DETROIT · County 163, Michigan · Built 1971 · 6 Lanes · 121,634 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000011567
Year Built
1971
Length
54.8 m (179.8 ft)
Max Span
54.8 m
Width
39.1 m (128.3 ft)
Lanes
6
Daily Traffic
121,634
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$441,000
Total Project Cost
$263,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.