M-5 GRAND RIVER AV over I-96 (JEFFRIES FRWY)

IN DETROIT · County 163, Michigan · Built 1971 · 6 Lanes · 17,798 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000011564
Year Built
1971
Reconstructed
2005
Length
119.5 m (392.1 ft)
Max Span
32.9 m
Width
31.5 m (103.3 ft)
Lanes
6
Daily Traffic
17,798
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.