I-96 RAMP over LAND
IN DETROIT · County 163, Michigan · Built 1973 · 3 Lanes · 18,870 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
42.379339, -83.215969
This bridge is in worse condition than 89.2% of bridges in County 163. The average bridge in Michigan is 0 years old; this one is 53 years old.
Nearby Bridges
WB TO NB TURN RDWY over CSX RAILROAD-FULLERTON
Built 1973
TURN RDWY 4TH LEVL over CSX RR & 3RD LEVL TRN RD
Built 1973
I-96 WB COLLECTOR over M-39 (SOUTHFIELD EXPR)
Built 1970
WB TO SB TURN RDWY over 3RD LEVEL TURN RDWY
Built 1972
I-96 RAMP over OPEN GROUND
Built 1973
I-96 EB MAIN RDWY over M-39 (SOUTHFIELD EXP)
Built 1970
I-96 WB MAIN RDWY over M-39 (SOUTHFIELD EXPR)
Built 1970
EB FULLERTON AVE over M-39
Built 1964
TURN RDWY 3RD LEVL over I-96 ROADWAYS
Built 1972
I-96 EB COLLECTOR over M-39 SOUTHFIELD FRWY
Built 1970
Bridge Details
- Structure #
- 000000000011558
- Year Built
- 1973
- Length
- 376.8 m (1236.2 ft)
- Max Span
- 27.1 m
- Width
- 15.7 m (51.5 ft)
- Lanes
- 3
- Daily Traffic
- 18,870
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $234,000
- Total Project Cost
- $275,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.