TURN RDWY 3RD LEVL over I-96 & CSX RR

IN DETROIT · County 163, Michigan · Built 1973 · 2 Lanes · 18,870 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000000011541
Year Built
1973
Length
406.7 m (1334.3 ft)
Max Span
36.2 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
18,870
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.