EUCLID AVENUE over M-10

IN DETROIT · County 163, Michigan · Built 1954 · 4 Lanes · 6,640 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000011430
Year Built
1954
Reconstructed
2000
Length
43.7 m (143.4 ft)
Max Span
23.2 m
Width
21.8 m (71.5 ft)
Lanes
4
Daily Traffic
6,640
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.