GRAND RIVER AVE over I-94

IN DETROIT · County 163, Michigan · Built 2022 · 5 Lanes · 9,405 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000011185
Year Built
2022
Length
74.2 m (243.4 ft)
Max Span
40.3 m
Width
32.6 m (107 ft)
Lanes
5
Daily Traffic
9,405
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.