TREATMENT PLANT DR over HURON RIVER
0.5 MI E US-23 · County 161, Michigan · Built 1934 · 2 Lanes · 75 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.270342, -83.667856
This bridge is in worse condition than 57.3% of bridges in County 161. The average bridge in Michigan is 0 years old; this one is 92 years old.
Nearby Bridges
DIXBORO RD over MDOT RR COR & HURON RVR
Built 2004
OLD DIXBORO ROAD over HURON RIVER
Built 1921
OLD DIXBORO ROAD over HURON RIVER
Built 1921
GEDDES ROAD over FLEMING CREEK
Built 1989
US-23 NB over MDOT RR COR & HURON RVR
Built 1962
US-23 SB over MDOT RR COR & HURON RVR
Built 1962
GEDDES RD over US-23
Built 1961
US-23 NB over HURON RIVER DRIVE
Built 1962
US-23 SB over HURON RIVER DRIVE
Built 1962
HURON RIVER DRIVE over PITTSFIELD ANN ARBOR DRN
Built 1979
Bridge Details
- Structure #
- 000000000011078
- Year Built
- 1934
- Reconstructed
- 1985
- Length
- 35.7 m (117.1 ft)
- Max Span
- 18 m
- Width
- 5.6 m (18.4 ft)
- Lanes
- 2
- Daily Traffic
- 75
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $77,000
- Total Project Cost
- $77,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.