US-12 over US-23

@ US-12 · County 161, Michigan · Built 2023 · 2 Lanes · 28,825 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 9 Excellent
Substructure 9 Excellent

Location

42.205772, -83.685158

This bridge is in worse condition than 15.3% of bridges in County 161. The average bridge in Michigan is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
000000000010896
Year Built
2023
Length
66.8 m (219.2 ft)
Max Span
33.4 m
Width
27.7 m (90.9 ft)
Lanes
2
Daily Traffic
28,825
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.