M-52 over LETTS DRAIN

IN CHELSEA · County 161, Michigan · Built 1951 · 2 Lanes · 16,199 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000010809
Year Built
1951
Length
9.1 m (29.9 ft)
Max Span
9.1 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
16,199
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$75,000
Total Project Cost
$25,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.