8TH AVE over S BR BLACK RIVER
2.5 MI E OF SOUTH HAVEN · County 159, Michigan · Built 1967 · 2 Lanes · 705 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
42.389336, -86.214497
This bridge is in worse condition than 92.3% of bridges in County 159. The average bridge in Michigan is 0 years old; this one is 59 years old.
Nearby Bridges
PHOENIX RD CR 388 over S BR BLACK RIVER
Built 1985
CR 384 over S BR BLACK RIVER
Built 1973
PHOENIX RD CR 388 over BUTTERNUT CREEK
Built 2015
68TH STREET over TRIB TO BLACK RIVER
Built 1972
CR 687 over EASTMAN CREEK
Built 2015
70TH STREET over S BR BLACK RIVER
Built 1980
16TH AVE over CEDAR CREEK
Built 2001
I-196BLEB(PHOENIX) over I-196
Built 1972
I-196BLWB(PHOENIX) over I-196
Built 1963
M-43 over I-196
Built 1963
Bridge Details
- Structure #
- 000000000010769
- Year Built
- 1967
- Length
- 16.4 m (53.8 ft)
- Max Span
- 5.4 m
- Width
- 9 m (29.5 ft)
- Lanes
- 2
- Daily Traffic
- 705
- Material
- Wood or Timber
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $600,000
- Total Project Cost
- $780,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.